What we pour in Chloride
Slabs and footings, steps and retaining walls, driveways and parking pads, shop and outbuilding floors, and repair or replacement of old concrete.
It is a small town with a lot of history, and much of the built fabric is old. Working around what is already there carefully matters more here than it does on an open lot.
Winter is the design constraint
Chloride is the highest point in our service area and freezes regularly. Everything that is optional lower down becomes standard here: air-entrained concrete for exterior flatwork, protection while the slab gains strength, and a schedule that does not put a fresh pour into a freezing night.
Ground snow load in the county's adopted design criteria is 5 psf for 3,000 to 4,500 feet, which covers Chloride. It is a modest number, but it is a reminder that this is a genuinely different environment from Bullhead City an hour away.
Ground and access
Sitting on the southwestern flank of the Cerbat Mountains, the ground here is coarser and rockier than the deep basin fill down in the valleys, and excavation can be slower and harder as a result.
The townsite has narrow, largely unpaved streets and large lots. Getting a loaded truck to the pour is a real question and we check it before quoting rather than after.